Bangladesh - Okra
Activity | Activity item | Average Cost | No. of times used |
---|---|---|---|
Mulch | Plastic material | 1,824.7 Taka /500sqm | 18 times |
Mulch | Labor hired | 202.8 Taka /500sqm | 6 times |
Mulch | Straw material | 98.2 Taka /500sqm | 17 times |
Mulch | Other mulch material | 0.0 Taka /500sqm | 5 times |
Total | 2,125.7 Taka /500sqm |