Uganda - Cucumber
Cucumber (Uganda)
Activity | Activity item | Average Cost | No. of times used |
---|---|---|---|
Mulch | Plastic material | 187,500.0 Shilling /500sqm | 1 times |
Mulch | Bamboo Stick | 93,750.0 Shilling /500sqm | 1 times |
Mulch | Straw material | 18,750.0 Shilling /500sqm | 1 times |
Mulch | Labor hired | 12,500.0 Shilling /500sqm | 1 times |
Mulch | Transport | 9,375.0 Shilling /500sqm | 1 times |
Total | 321,875.0 Shilling /500sqm |