Bangladesh - Sponge Gourd
Activity | Activity item | Average Cost | No. of times used |
---|---|---|---|
Mulch | Plastic material | 386.1 Taka /500sqm | 8 times |
Mulch | Straw material | 52.4 Taka /500sqm | 13 times |
Mulch | Labor hired | 31.8 Taka /500sqm | 3 times |
Mulch | Other mulch material | 6.7 Taka /500sqm | 8 times |
Total | 477.0 Taka /500sqm |