Bangladesh - Watermelon
Watermelon (Bangladesh)
Activity | Activity item | Average Cost | No. of times used |
---|---|---|---|
Land Preparation | Ploughing | 494.1 Taka /500sqm | 66 times |
Land Preparation | Bed preparation | 452.7 Taka /500sqm | 74 times |
Land Preparation | Labor hired | 71.8 Taka /500sqm | 16 times |
Land Preparation | Manure | 42.9 Taka /500sqm | 80 times |
Land Preparation | Clearing | 11.5 Taka /500sqm | 4 times |
Land Preparation | Gasoil- fuel | 4.3 Taka /500sqm | 1 times |
Total | 1,077.3 Taka /500sqm |