Bangladesh - Ridge Gourd
Activity | Activity item | Average Cost | No. of times used |
---|---|---|---|
Mulch | Straw material | 76.2 Taka /500sqm | 8 times |
Mulch | Plastic material | 63.2 Taka /500sqm | 1 times |
Mulch | Labor hired | 48.5 Taka /500sqm | 2 times |
Mulch | Other mulch material | 0.0 Taka /500sqm | 5 times |
Total | 187.9 Taka /500sqm |