Bangladesh - Pumpkin
Pumpkin (Bangladesh)
Activity | Activity item | Average Cost | No. of times used |
---|---|---|---|
Irrigation | Labor hired | 164.1 Taka /500sqm | 9 times |
Irrigation | Water hose | 89.3 Taka /500sqm | 2 times |
Irrigation | Water | 4.8 Taka /500sqm | 1 times |
Irrigation | Fuel-gasoil | 0.9 Taka /500sqm | 1 times |
Irrigation | Pump | 0.2 Taka /500sqm | 1 times |
Irrigation | Watertank | 0.0 Taka /500sqm | 1 times |
Total | 259.3 Taka /500sqm |