Uganda - Cabbage
Cabbage (Uganda)
Activity | Activity item | Average Cost | No. of times used |
---|---|---|---|
Irrigation | Water | 5,091.4 Shilling /500sqm | 3 times |
Irrigation | Watertank | 199.2 Shilling /500sqm | 2 times |
Irrigation | Others | 60.0 Shilling /500sqm | 1 times |
Irrigation | Labor hired | 31.7 Shilling /500sqm | 2 times |
Total | 5,382.3 Shilling /500sqm |