Uganda - Cabbage
Activity | Activity item | Average Cost | No. of times used |
---|---|---|---|
Mulch | Straw material | 10,663.1 Shilling /500sqm | 9 times |
Mulch | Plastic material | 1,427.5 Shilling /500sqm | 5 times |
Mulch | Bamboo Stick | 141.5 Shilling /500sqm | 3 times |
Mulch | Labor hired | 18.5 Shilling /500sqm | 2 times |
Total | 12,250.5 Shilling /500sqm |